MIL-DTL-3965H
3.26.1 Solder and soldering flux. Solder and soldering flux shall be of such quality as to enable the capacitors to
meet all the requirements of this specification.
3.26.2 Riveting (when applicable). The riveting operation shall be performed carefully to insure that the rivet is
tight and satisfactorily headed.
3.26.3 Terminals and end seals. All terminals and end seals shall be free of grease or other foreign material.
3.26.4 Insulating sleeving (when applicable). Insulating sleeving shall fit the container case in such a manner that
there are no loose ragged ends.
3.27 AC ripple life at 85°C (when specified, see 3.1). Capacitors shall be tested as specified in 4.7.21, capacitors
shall meet the following requirements:
DC leakage
(at 125°C and 25°C) Shall not exceed the applicable value specified (see 3.1).
Capacitance
Shall change not more than the percent specified (see 3.1)
from the initial measured value (see 3.10).
Dissipation factor
Shall not exceed the applicable value specified (see 3.1).
Visual examination
There shall be no damage, obliteration of marking, or leakage
of electrolyte.
3.28 Recycled, recovered, or environmentally preferable materials. Recycled, recovered, or environmentally
preferable materials should be used to the maximum extent possible provided that the material meets or exceeds the
operational and maintenance requirements, and promotes economically advantageous life cycle costs.
4. VERIFICATION
4.1 Classification of inspections. The inspections specified herein are classified as follows:
a. Qualification inspection (see 4.4).
b. Verification of qualification (see 4.5).
c. Conformance inspection (see 4.6).
d. Periodic inspection (see 4.7).
4.2 Test equipment and inspection facilities. Test and measuring equipment and inspection facilities of sufficient
accuracy, quality and quantity to permit performance of required inspection shall be established and maintained by
the contractor. The establishment and maintenance of a calibration system to control the accuracy of the measuring
and test equipment shall be in accordance with ANSI/NCSL Z540-1, ISO 10012-1 or approved equivalent.
4.3 Inspection conditions and methods.
4.3.1 Inspection conditions. Unless otherwise specified herein, all inspections shall be performed in accordance
with the test conditions specified in the "GENERAL REQUIREMENTS" of MlL-STD-202.
11
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business