MIL-PRF-23269G
4.4.4 FRL and quality level verification.
4.4.4.1 FR qualification and lot conformance FR inspection. FR qualification and lot conformance FR inspection
shall be in accordance with the general and detailed requirements of MIL-STD-690 with the following details:
a. Procedure I: Qualification at the initial FRL. Level M of FRSP-90 shall apply. Sample units which have
been subjected to the qualification inspection specified in group VI, table III (see 4.4.2) shall be continued on
test as specified in 4.7.20.3.1.
b. Procedure II: Extension of qualification to lower FRL. To extend qualification to the R and S FRL, data from
two or more styles of similar construction (see 4.6.1.1) may be combined.
c. Procedure III: Maintenance of FRL qualification. Maintenance period B of FRSP-10 shall apply. Regardless
of the number of production lots produced during this period, the specified number of unit hours shall be
accumulated to maintain qualification.
d. Procedure VII: Lot conformance FR inspection. Lot conformance FR inspection shall be in accordance with
4.4.4.2 Quality level verification. The contractor is responsible for establishing a quality system to verify the ppm
defect level of lots. The ppm defect level shall be based on a 6-month moving average.
4.5 Verification of qualification. Every six months, the manufacturer shall verify the retention of qualification to the
qualifying activity. Continuation of qualification shall be based on meeting the following requirements:
MIL-STD-790 program.
a.
b.
The capacitor design has not been modified.
c.
Lot rejection for group A inspection does not exceed 10 percent or one lot, whichever is greater.
d.
Periodic group C inspection.
e.
FRL's.
f.
PPM assessment.
4.6 Conformance inspection.
4.6.1 Inspection of product for delivery. Inspection of product for delivery shall consist of group A inspection.
4.6.1.1 Inspection lot. An inspection lot shall consist of capacitors from the same production line or lines, of one
or more styles, from the same basic design, produced under essentially the same conditions, and offered for
inspection during a period not exceeding 1 month. Each lot shall be kept separate from every other lot. The sample
selected from the lot shall be representative of the capacitance values and case sizes in the lot. All sample units
belonging to a lot shall be identified by means of a code symbol (either letters or numbers, at the option of the
manufacturer). The following styles are considered to be of similar construction and may be combined for
conformance testing and FRL maintenance:
Group
Styles
*
1
-
2
-
CYR51, CYR52, and CYR53 (/10).
A separate sample for each of the two groups shall be submitted for conformance testing and FRL maintenance.
10
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business