MIL-PRF-55365H
4.7.11 Thermal shock (unmounted) (see 3.14). Capacitors shall be tested in accordance with
method 107 of MIL-STD-202. The following details and exceptions shall apply:
a. Mounting of specimens: Not applicable.
b. Initial measurements: Not applicable.
c. Test condition letter: A (5 cycles), except that in step 3, sample units shall be tested at +125°C +3°C, -0°C.
Step 3 may be performed at +150°C +3°C, -0°C at the option of the manufacturer. Step 1 may be performed
at -65°C +0°C, -5°C at the option of the manufacturer.
d. Measurements after thermal shock: Not applicable.
e. Examination after test: Not applicable.
4.7.12 Thermal shock (mounted) (see 3.15). Capacitors shall be tested in accordance with
method 107 of MIL-STD-202. The following details and exceptions shall apply:
a. Mounting of specimens: Capacitors shall be mounted on a substrate as specified in 4.7.1.
b. Initial measurements: Capacitance (see 4.7.7).
c. Test condition letter: B, except with 10 cycles.
d. Measurements after thermal shock: DC leakage, capacitance, dissipation factor, and ESR (when specified,
e. Examination after test: Capacitors shall be visually examined for evidence of harmful corrosion, mechanical
damage, and obliteration of marking (if applicable).
4.7.13 Resistance to soldering heat (see 3.16). Capacitors shall be tested in accordance with
method 210 of MIL-STD-202. The following details and exception shall apply:
a. Mounting of specimens: Capacitors shall be mounted on a substrate as specified in 4.7.1.
b. Measurements prior to test: DC leakage, capacitance, and dissipation factor shall be measured as specified
c. Test condition letter: J, except with only one heat cycle.
d. Measurements after test: After completion of the cleaning process and following a minimum 3-hour cooling
period, the dc leakage, capacitance, and dissipation factor shall be measured as specified in 4.7.6, 4.7.7,
and 4.7.8, respectively.
e. Examination after test: Capacitors shall be visually examined for evidence of mechanical damage.
25
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business