MIL-PRF-49137E
3.12 Thermal shock. When tested as specified in 4.8.9, capacitors shall meet the following requirements:
a. DC leakage: Shall not exceed the requirement specified in 3.7.
b. Capacitance: Shall not change more than ±10 percent from the initial measured value (see 3.8).
c. Dissipation factor: Shall not exceed the requirement specified in 3.9.
d. Visual examination: There shall be no evidence of harmful corrosion, mechanical damage, and obliteration of
marking wherever applicable.
3.13 Resistance to soldering heat. When capacitors are tested as specified in 4.8.10, there shall be no evidence
of mechanical damage.
3.14 Terminal strength. When capacitors are tested as specified in 4.8.11, there shall be no loosening of the
terminals or permanent damage to the terminals.
3.15 Moisture resistance. When tested as specified in 4.8.12, capacitors shall meet the following requirements:
a. DC leakage: Shall not exceed 300 percent of the requirement specified in 3.7.
b. Capacitance: Shall not change more than ±15 percent from the initial measured value (see 3.1 and 3.8).
c. Dissipation factor: Shall not exceed 150 percent of the requirement specified in 3.9.
d. Visual examination: There shall be no evidence of harmful corrosion, mechanical damage, or obliteration of
marking wherever applicable.
3.16 Stability at low and high temperatures. When tested as specified in 4.8.13, capacitors shall meet the
following requirements:
a. Step 1 (+25°C):
(1) DC leakage: Shall not exceed the applicable value specified (see 3.1).
(2) Capacitance: Shall be within tolerance of the nominal value specified (see 3.1).
(3) Dissipation factor: Shall not exceed the applicable value specified (see 3.1).
b. Step 2 (-55°C):
(1) Capacitance: Shall not change more than the applicable value specified (see 3.1) from the step 1
measured value.
(2) Dissipation factor: Shall not exceed the applicable value specified (see 3.1).
c. Step 3 (+25°C):
(1) DC leakage: Shall not exceed the applicable value specified (see 3.1).
(2) Capacitance: Shall not change more than 10 percent from the step 1 measured value.
(3) Dissipation factor: Shall not exceed the requirement specified in 3.9.
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business