MIL-PRF-87164A
TABLE IV. Qualification inspection.
Number of
Number of
defectives
sample
Inspection
Requirement
Method
allowed 1/
units to be
Paragraph
paragraph
inspected
Group I 2/
Dielectric withstanding voltage
3.6
4.7.2
125
0
High voltage stabilization
3.11
4.7.7
Group II 2/
4.7.1
3.1, 3.4 to 3.5.2 inclusive,
Visual and mechanical examination 3/
3.24 to 3.25 inclusive
125 4/
4.7.3
3.7
Barometric pressure
0
4.7.4
3.8
Insulation resistance
4.7.5
3.9
Capacitance
4.7.6
3.10
Dissipation factor
Group III
3.12
4.7.8
Solderability
3.13
4.7.9
Vibration, high frequency
4.7.10
18
1
3.14
Temperature coefficient and
capacitance drift
Thermal shock and immersion
4.7.11
3.15
Group IV
4.7.12
3.16
Shock, specified pulse
4.7.13
18
1
3.17
Terminal strength
4.7.14
3.18
Moisture resistance
Group V
Life (accelerated conditions)
3.19
4.7.15.1
79
1
Group VI
Fungus 5/
3.20
4.7.16
5
Resistance to solvents
3.21
4.7.17
0
Resistance to soldering heat
3.22
4.7.18
5
1/
A sample unit having one or more defects shall be considered as a single defective.
2/
Nondestructive tests.
3/
Marking defects are based on visual examination only and shall be charged only for illegible, incomplete, or
incorrect marking.
4/
Sample units shall be those that have passed group I inspection.
5/
Certification of fungus resistance may be substituted for testing.
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business