MIL-PRF-55365H
4.6.1.2.9 PPM calculations . The manufacturer shall establish a ppm system in accordance with 3.3.2 for
*
assessing and calculating average outgoing quality of capacitors. A ppm rate combining dc leakage, capacitance,
dissipation factor, and ESR shall be assessed for lots that have passed the group A inspection. The manufacturer's
ppm system shall also address rectification procedures for lots failing ppm assessment. Data from the rectification
process shall not be used to calculate ppm.
4.6.1.3 Periodic group C inspection (ER only). Group C inspection shall consist of the tests specified in table X, in
the order shown. Group C inspection shall be made on sample units selected from inspection lots which have
passed group A inspection; however, sample units subjected to surge voltage and solderability shall not be used.
4.6.1.3.1 Sampling plan. There shall be 87 (up to 62 for Weibull) sample units of each specification sheet taken
from production every 3 months and subdivided as specified for the subgroups listed in table X and subjected to the
tests specified in those subgroups, in the order shown. The maximum and minimum case sizes manufactured during
that 3-month period shall be represented in the sample in at least the approximate ratio of production. Styles
CWR09, CWR19, and CWR29 may be combined for group C inspection, styles CWR06 and CWR16 may be
combined for Group C testing as well. On an annual basis, all voltage groups produced, as defined in 4.6.1.1.1, shall
be represented. Allowable failures shall be as specified in table X.
4.6.1.3.2 Disposition of sample units. Sample units which have been subjected to group C inspection shall not be
delivered on the contract or order.
4.6.1.3.3 Noncompliance. If the sample fails to pass group C inspection, the supplier shall take corrective action
on the materials or processes, or both, as warranted, and on all units of product which can be corrected and which
were manufactured under essentially the same conditions, with essentially the same materials and processes, and
which are considered subject to the same failure. Acceptance of the product shall be discontinued until corrective
action, acceptable to the Government, has been taken. After the corrective action has been taken, group C
inspection shall be repeated on additional sample units (all inspections or the inspection that the original sample
failed, at the option of the Government). Group A inspection may be reinstituted; however, final acceptance shall be
withheld until the group C reinspection has shown the corrective action was successful. In the event of failure after
reinspection, information concerning the failure and corrective action taken shall be furnished to the cognizant
inspection activity and the qualifying activity.