MIL-PRF-83421E
4.6.1.2.4 PPM calculations. The manufacturer shall establish a PPM system in accordance with 3.3.2 for
assessing and calculating average outgoing quality of capacitors. A PPM rate combining capacitance, DF, IR
(+25°C), and ESR shall be assessed for lots that have passed the group A inspection. The manufacturer's PPM
system shall also address rectification procedures for lots failing PPM assessment. Data from the rectification
process shall not be used to calculate PPM.
4.6.2 Periodic group B inspection. Periodic group B inspection shall consist of the tests specified in table V, in the
order shown, and shall be performed on sample units selected from inspection lots that have passed group A
inspection. Except where the results of these inspections show noncompliance with the applicable requirements (see
4.6.2.3), delivery of products that have passed group A shall not be delayed pending the results of periodic
inspection.
4.6.2.1 Sampling plan.
4.6.2.1.1 Subgroup 1. Every 2 months, 12 sample units from production shall be inspected as shown in table V.
4.6.2.1.2 Subgroup 2. A minimum of 10 sample units shall be selected from each group A inspection lot as
defined in 4.6.1.1.1. The actual number of sample units required to maintain the required FRL may be more.
If qualification has been granted at the "R" or "S" FRL for MIL-PRF-83421/2 styles (CRH11, CRH12, and CRH13),
and production is not sufficient to maintain the FRL, qualification may be maintained by similarity with MIL-PRF-
83421/1 styles. However, a minimum number of hours shall be generated from MIL-PRF-83421/2 styles to maintain
"P" FRL. This may require more than the minimum number of 10 sample units. Similarity may only be used for FRL
maintenance and not for initial qualification.
4.6.2.1.3 Subgroup 3. Sample units of the same style shall be inspected (see 3.1). Testing need only be done in
January and July (30 V dc units); February and August (50 V dc units); March and September (100 V dc units); April
and October (200 V dc units); May and November (400 V dc units); and June and December (300 V dc and 600 V dc
units).
4.6.2.1.4 Subgroup 4. Every 6 months, 2 sample units of each case diameter produced shall be inspected as
shown in table V. The maximum and minimum case sizes manufactured shall be represented in the sample in at
least the approximate ratio of production.
4.6.2.1.5 Subgroup 5. Every 6 months, 18 sample units from production shall be divided and inspected as shown
in table V. The maximum and minimum case sizes manufactured shall be represented in the sample in at least the
approximate ratio of production.
4.6.2.2 Disposition of sample units. Subgroup 2 through subgroup 5 inspections are considered destructive.
Sample units that have been subjected to these inspections shall not be delivered on the contract.
4.6.2.3 Noncompliance. If a sample unit fails to pass group B inspection, the manufacturer shall notify the
qualifying activity and cognizant activity of such failure and take corrective action on the materials or processes, or
both, as warranted, and on all units of product which can be corrected and which were manufactured under
essentially the same conditions, with essentially the same materials, processes, and so forth, and which are
considered subject to the same failure.
4.7 Methods of inspection and test.
4.7.1 Visual and mechanical inspection. All capacitors shall be examined using 5X to 7X magnification to verify
that the materials, design, construction, physical dimensions, marking, and workmanship are in accordance with the
15
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business