MIL-PRF-11693E
In the event that no production occurred during the reporting period, a report shall be submitted certifying that the
company still has the capabilities and facilities necessary to produce the item. If during 3 consecutive reporting
periods there has been no production, the manufacturer may be required, at the discretion of the qualifying activity, to
submit (the products, a representative product of each type, grade, class, etc.) to testing in accordance with the
qualification inspection requirements.
4.6 Conformance inspection.
4.6.1 Inspection of product for delivery. Inspection of product for delivery shall consist of group A inspection.
Except as specified in 4.6.2.3, delivery of products which have passed group A inspection shall not be delayed
pending the results of group B inspection.
4.6.1.1 Inspection lot. An inspection lot shall consist of all capacitors of the same style, current and voltage ratings
produced under essentially the same conditions, and offered for inspection at the same time. ER parts shall be kept
separate from non-ER parts.
4.6.1.2 Group A inspection. Group A inspection shall consist of the examinations and tests specified in table VII in
the order shown.
4.6.1.2 1 Sampling plan. The sampling plan shall be as specified in table VII. In the event of one or more failures,
the lot shall be rejected.
4.6.1.2.2 Subgroup 1. If during the 100 percent inspection of subgroup 1 (ER parts only), screening requires that
over 5 percent of the capacitors be discarded, the lot shall be rejected and shall not be supplied to this specification.
4.6.1.2.3 Manufacturers production inspection for ER parts only. If the manufacturer performs tests similar to
those specified in subgroup 1, table VII, as the final step of his production process, group A, subgroup 1 inspection
may be waived and the data resulting from the manufacturer's production tests may be used instead. Authority to
waive the subgroup 1 inspection shall be granted by the qualifying activity only. The following criteria must be
complied with:
a. Tests conducted by the manufacturer during production shall be clearly identical to or more stringent than that
specified for subgroup 1.
b. Manufacturer subjects 100 percent of the product supplied under this specification to their production tests.
c. The parameters measured and the failure criteria shall be the same or more stringent than those specified
herein.
d. The lot rejection criteria is the same or more stringent than that specified herein.
4.6.1.2.4 Rejected lots. If an inspection lot is rejected, the supplier may rework it to correct the defects, or screen
out the defective units, and resubmit for reinspection. If one or more defects are found during this reinspection, the
lot shall be rejected and not be supplied to this specification. Reinspected lots shall be separate from new lots, and
shall be clearly identified as reinspected lots.
4.6.1.2.5 PPM calculations (ER and non-ER). The manufacturer shall establish and maintain a system for
assessing and calculating average outgoing quality of capacitors. A PPM rate combining IR, capacitance, and DF
shall be assessed for lots that have passed the group A inspection. The manufacturer's PPM system shall also
address rectification procedures for lots failing PPM assessment. Data from the rectification process shall not be
used to calculate PPM.
13
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business