MIL-PRF-81F
4.3.2 Inspection routine. The sample shall be subjected to the inspections specified in table II, in the order
shown. All sample units shall be subjected to the inspections of group I. The sample shall then be divided as
specified in table II for group II and group III and subjected to the inspection for their particular group.
4.3.3 Failures. Failures in excess of those allowed in table II shall be cause for refusal to grant qualification.
4.4 Conformance inspection.
4.4.1 Inspection of product for delivery. Inspection of product for delivery shall consist of group A and group B
inspection.
4.4.1.1 Inspection lot. An inspection lot shall consist of capacitors of the same style and characteristic produced
under essentially the same conditions, and offered for inspection at one time.
4.4.2 Group A inspection. Group A inspection shall consist of the examinations and tests specified in table III, in
the order shown.
4.4.2.1 Sampling plan. The sampling plan shall be as specified in table III.
TABLE III. Group A inspection.
Inspection
Requirement
Method
Sampling
paragraph
paragraph
procedure
Subgroup 1
13 samples
Visual and mechanical inspection
0 failures
design, construction, and physical
dimensions
Marking
3.20 to 3.20.2
Workmanship
inclusive
Subgroup 2
13 samples
Dielectric withstanding voltage
0 failures
Insulation resistance
Capacitance
Dissipation factor
4.4.3 Group B inspection. Group B inspection shall consist of the tests specified in table IV, in the order shown.
Shipment of capacitor lots shall not be accomplished until representative samples of the lot have successfully
completed the group B tests.
4.4.3.1 Sampling plan. The sampling plan shall be as specified in table IV.
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business