MIL-PRF-81/1E
Reference documents: In addition to MIL-PRF-81, this document references to following.
*
Qualification inspection: Qualification inspection is not required. A manufacturer that is currently listed on the QPL for
at least one other MIL-PRF-81 style may supply CV11 parts by performing the group A and group B testing. A
manufacturer that is not qualified to any MIL-PRF-81 styles may produce these parts by performing the group A,
group B, and group C testing on the product before delivery.
Changes from previous issue. The margins of this specification are marked with asterisks to indicate where changes
from previous issue were made. This was done as a convenience only and the Government assumes no liability
whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the
requirements of this document based on the entire content irrespective of the marginal notations and relationship to
the last previous issue.
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - EC
Air Force - 85
(Project 5910-2011-006)
DLA - CC
Review activities:
Army - AR, MI
Air Force 19, 99
NOTE: The activities listed above were interested in this document as of the date of this document. Since
organizations and responsibilities can change, you should verify the currency of the information above using ASSIST
Online database at https://assist.daps.dla.mil .
4