MIL-PRF-39018/6D
Step 4 (at +105°C):
DCL - See table I.
ĆCap. - Within ±30 percent of step 1 value.
ESR - See table I.
Step 5 (at +25°C):
DCL - See table I.
ĆCap. - Within ±5 percent of step 1 value.
ESR - See table I.
Life: Method 108 of MIL-STD-202.
For qualification: Condition F (2,000 hours) at 85°C.
DCL - See table I.
ĆCap. - Within ±10 percent of initial measured value.
ESR - Not more than 130 percent of initial requirement.
10,000 hour (extended life and group C) at 85°C.
DCL - See table I.
ĆCap. - Within ±15 percent of initial measured value.
ESR - Not more than 250 percent of initial requirement.
Case insulation: In accordance with MIL-PRF-39018.
Shock (specified pulse): Method 213 of MIL-STD-202, condition H.
Low frequency In accordance with MIL-PRF-39018.
*
Vibration:
Thermal shock and immersion:
Thermal shock: Method 107 of MIL-STD-202, condition A, except in step 3, units shall be tested at applicable
high temperature.
Immersion: Method 104 of MIL-STD-202, condition B (2 cycles, 30 minutes).
DCL - See table I.
ĆCap. - Within ±5 percent of initial measured value.
ESR - See table I.
Case insulation - Shall meet initial requirements.
Surge voltage:
DCL - See table I.
ĆCap. - Within ±6 percent of initial measured value.
ESR - See table I.
Vent: In accordance with MIL-PRF-39018.
Moisture resistance: Method 106 of MIL-STD-202.
DCL - See table I.
ĆCap. - Within ±6 percent of initial measured value.
ESR - See table I.
Case insulation - Shall meet initial requirements.
High temperature exposure (500 hours at 105°C):
DCL - Not more than 200 percent of initial requirement.
ĆCap. - Within ±10 percent of initial measured value.
ESR - Not more than 115 percent of initial requirement.
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business