MIL-PRF-39003/10D
TABLE III. Group A inspection. 4/
PDA (Max) 6/
Footnotes
Sample
Examination or test
size
Subgroup 1
X-Ray (2 views 90° apart)
1/
7/
100%
N.A.
Thermal shock (10 cycles)
1/
5/
100%
N.A.
Surge current
10 cycles at -55°C
5/
100%
N.A.
10 cycles at +85°C
DC leakage at +25°C
1/
100%
5%
Capacitance (120 Hz)
1/
100%
D.F. (120 Hz)
1/
100%
Seal
1/
100%
N.A.
Weibull FR level grading
5/
100%
N.A.
DC leakage at +25°C
1/
100%
Capacitance (120 Hz)
1/
100%
5%
2/
ESR (100 kHz)
1/
2/
100%
Subgroup 2 3/
Lot to be 100%
Visual and mechanical
13 pcs
Inspected if 1 or
inspection
more failures.
Subgroup 3
Lot to be 100%
Stability at low and high
20 pcs
inspected if 1 or more
temperature
failures.
1/ Requirements and/or methods in accordance with MIL-PRF-39003 unless otherwise
specified.
2/ Parts with ESR greater than specification limits shall be rejected. Parts with ESR greater
than 150 percent of specified limits shall be used for computation of percent defectives.
12
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business